Letter to the Metrolinx Board with Transit Projects for Brampton #brampoli


Please see here for a PDF for a copy of our latest correspondence to the Metrolinx Board for their September 2017 meeting. Please note that copies of all letters/emails sent to the Metrolinx Board are added to the official minutes of the Board meeting and acknowledged by the Chair before the meeting starts.

Our September 2017 letter covered the following topics that were mentioned in the Board report:

  1. Metrolinx 2017-18 Business Plan: Kitchener Corridor Expansion and Freight Bypass;
  2. Capital Projects Group Quarterly Report;
  3. Off-Peak GO Train Service;
  4. The Next Regional Transportation Plan (RTP): Draft Plan for Public Consultation; and
  5. Hurontario LRT (HuLRT)

Our letter for the June 2017 meeting is here. Topics included:

  1. Brampton-Halton Freight Rail Bypass (BHFRB) for the CN Rail Halton Subdivision;
  2. Hydrogen;
  3. Off-Peak GO Train Service;
  4. Bramalea GO Station Revitalization;
  5. Naming of the Hurontario LRT (HuLRT) LRVs;
  6. High-Speed Rail (HSR); and
  7. Thank you

Our letter for the June 2016 meeting is here.

  1. Expanded GO Train Service for the Kitchener Corridor

A key note of the is letter is that it was jointly signed by a number of organizations in Brampton and along the Kitchener Corridor.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s