Metrolinx

Letter to the Metrolinx Board Highlighting Brampton Topics


Metrolinx allows for written deputations for their Board meetings and in the past we’ve submitted feedback on issues that matter to Brampton residents. The Board met today and as we’ve done in the past, we submitted a letter to highlight topics important to Brampton residents. PDF version of our letter is available here. Text version below.

The letter notes a number of staff reports before the Board and you can see a copy of those reports here. The meetings are livestreamed and then available on Metrolinx’s YouTube channel.

Let us know if you have any feedback on the letter. Also, we’re always looking for volunteers to advocate for transit and active transportation so don’t hesitate to get in touch with us.

Donald Wright, Chair
Metrolinx
97 Front St W, 4th floor
Toronto, Ontario  M5J 1E6

September 13, 2018


Dear Mr. Wright,

We are pleased to have the opportunity to provide feedback on a number of items before the Board at your September 14, 2018 meeting.

First, congratulations on being appointed Chair of the Metrolinx Board. Fight Gridlock in Brampton is a Brampton-based group of residents who volunteer to advocate for more rapid transit investment, transit service improvements, and active transportation for our city.

We’ve reviewed the agenda package for the meeting and provide the following comments:

Item No. 8 RTP/”Making it Happen” Update, page 5

“Strategic passenger & freight rail: A Quality Based Selection (QBS) tender was released in June 2018 to study options for journey time and service frequency improvements on the Kitchener Corridor. Some of these options anticipate the construction of a freight bypass to facilitate the separation of passenger and freight rail traffic on the Halton Subdivision.”

It’s encouraging to hear that progress is being made for more GO train service west of Bramalea Station. We continue to encourage Metrolinx, CN Rail, the Province, the Federal government, and the City of Brampton to work collaboratively on increasing capacity and service.

Item No. 12 Quarterly Reports, 12.4 Capital Projects

Page 2 – it’s always helpful to see Table 1: Program Overview which outlines the budget – including the $2.25B for the Kitchener Bypass – of the Metrolinx Capital projects.

Page 3 –  Hurontario LRT – it’s great to hear the RFP is “in-market” and we hope a decision and the awarding of the contract can be done soon.

Page 7 – Highway 401/409 Tunnel – this is an important project for the Kitchener Line and we’re pleased to read that design is nearing 60% completion. Also on this page, there is a reference made to work taking place at the Bramalea GO Station. We sincerely hope that active transportation is being taking into consideration for the Bramalea Station revitalization. Particularly, people walking and cycling from the streets fronting the property should have a safe and dedicated way to get to the station building. Please pass this comment to the design team.

Page 9 – Kitchener Extension – our feedback is that we think this heading should be called the “Freight Bypass for the Kitchener Line” in the future to add clarity.

Also, it’s great to hear that 12-coach trains will finally be added to the Kitchener Line. Our observation is that ridership is increasing on the Kitchener Line and 12-coach trains are very much needed.

Thank you to Metrolinx staff for all their hard work at expanding transit for our region and for Brampton.

– Members of Fight Gridlock in Brampton

cc: Mayor Jeffrey

Brampton’s MPPs

Minister of Transportation

Chris Duyvestyn, P.Eng., Director, Transportation Special Projects, City of Brampton

Darshpreet Bhatti, P.Eng., Director, Hurontario Light Rail, Metrolinx

 

Advertisements

Letter to the Metrolinx Board with Transit Projects for Brampton #brampoli


Please see here for a PDF for a copy of our latest correspondence to the Metrolinx Board for their September 2017 meeting. Please note that copies of all letters/emails sent to the Metrolinx Board are added to the official minutes of the Board meeting and acknowledged by the Chair before the meeting starts.

Our September 2017 letter covered the following topics that were mentioned in the Board report:

  1. Metrolinx 2017-18 Business Plan: Kitchener Corridor Expansion and Freight Bypass;
  2. Capital Projects Group Quarterly Report;
  3. Off-Peak GO Train Service;
  4. The Next Regional Transportation Plan (RTP): Draft Plan for Public Consultation; and
  5. Hurontario LRT (HuLRT)

Our letter for the June 2017 meeting is here. Topics included:

  1. Brampton-Halton Freight Rail Bypass (BHFRB) for the CN Rail Halton Subdivision;
  2. Hydrogen;
  3. Off-Peak GO Train Service;
  4. Bramalea GO Station Revitalization;
  5. Naming of the Hurontario LRT (HuLRT) LRVs;
  6. High-Speed Rail (HSR); and
  7. Thank you

Our letter for the June 2016 meeting is here.

  1. Expanded GO Train Service for the Kitchener Corridor

A key note of the is letter is that it was jointly signed by a number of organizations in Brampton and along the Kitchener Corridor.